Project Summary
Project Background / Description
Anoka County, in partnership with the City of Oak Grove, is developing plans for the reconstruction of the bridge on CSAH 22 (Viking Boulevard) over the Rum River. The project will consist of reconstructing the bridge over the Rum River to provide 8-foot shoulders, as well as allow CSAH 22 to remain open to traffic through the project construction. Construction of this project is anticipated to begin in 2023 and carry through the end of 2024.
Project Goals
- Safely accommodate all users including motor vehicles, freight, transit, pedestrians, and bicyclists;
- Replace the existing bridge;
- Improve storm water management and treatment;
- Reduce impacts and avoid the natural resources and wetlands adjacent to the highway corridor, where appropriate;
- Provide efficient mobility and access for all modes of travel;
- Develop a financially responsible design that minimizes right-of-way and environmental resource impacts; and
- Minimize the impacts to the public during construction.
Schedule
Provided below is an overview of the project schedule, identifying key milestones in the process.
- Develop/Evaluate Concepts – Winter/Spring 2021
- Identify Preferred Alternative – Spring 2021
- Preliminary Design – Spring/Summer 2021
- Open House – February 7, 2023
- Final Design – Winter 2022/2023
- Construction – Fall 2023 through Fall 2024
Layout
Layout - Current Layout - 09/22/2022
Project Contacts
If you have any questions about the proposed project or would like to comment on any aspect of the project, please contact either of the representatives below:
- Daniel Frey, Design Engineer II, Project Manager