  1. August 8, 2022 - August 12, 2022
    Cities of Nowthen & Ramsey
    Culvert Replacement
    County Road 64 (181st Avenue NW)  - 875' West of 8301 - 181st Avenue NW

  2. August 8, 2022 - August 30, 2022
    City of Ham Lake
    Road Construction
    Eastbound CSAH 18 (Crosstown Blvd NE) from 3rd Street NE to CSAH 58 (175th Avenue NE)

  3. August 16, 2022 - August 24, 2022
    City of Columbia Heights
    Sewer Manhole Improvements
    CSAH 2 (40th Avenue) at TH 65 - East Side of TH 65 Intersection

  4. August 22, 2022 - August 26, 2022
    City of Ham Lake
    Culvert Replacement
    CSAH 116 (Bunker Lake Blvd) approximately 25' East of 2955 Bunker Lake Blvd NE

  5. September 2, 2021 - Until Further Notice
    City of St. Francis
    Updated Notice of Bridge Restriction / Detour for Overweight Vehicles
    Weight Limit 32 Tons per Vehicle
    CSAH 28 (Ambassador Blvd NW)
         at Bridge over Seelye Brook

2022 Culvert Pipe Replacement Program

County
Road #

Road Name

City

Description
76Fawn Lake Drive NEEast Bethel500 feet West of Sunset Road NE
24Norris Lake Road NWNowthen1000 feet North of Pinnaker Road NW
32Ash StreetLino Lakes200 feet East of Centerville Road
32Ash StreetLino Lakes1100 feet West of Centerville Road
19Potomac Street NEColumbus25 feet South of 151st Avenue
116Bunker Lake Blvd NEHam Lake250 feet West of Guadalcanal St NE 
21Centerville RoadLino Lake1300 feet South of Birch Street
64181st Avenue NWNowthen200 feet West of Xenolith Street
64181st Avenue NWNowthen1800 feet East of Rabbit St NW
63Green Valley Road NWRamsey1/4 Mile West of TH 47
21Centerville RoadLino Lakes1500 feet North of Ash Street
18Broadway AvenueColumbus50 feet West of Lyons Street
54West Freeway DriveColumbus1300 feet North of 35W


2022 Construction Projects


Coon Rapids Boulevard (CSAH 1) and Blackfoot Street Signal Replacement

Anoka County, in partnership with the City of Coon Rapids, is developing a preliminary layout for replacing and updating the existing signal system at CSAH 1 (Coon Rapids Boulevard) and Blackfoot Street.  Construction is tentatively scheduled for 2022.

Foley Boulevard (CSAH 11) - BNSF Railway Grade Separation

Foley Boulevard, from East River Road to Coon Rapids Boulevard, will be reconstructed to a four-lane divided highway over the BNSF railroad tracks.  Additional pedestrian and traffic safety improvements will also be made during this construction.

Below is a time-lapse video of Foley Boulevard RR bridge project from July 2, 2021 - July 18, 2022.


109th Avenue (CSAH 12) Pedestrian Ramp Improvement Project

Four pedestrian ramp pairs, at the intersections of 109th Avenue (CSAH 12) with 6th Street, Terrace Road, Quincy Boulevard, and Buchanan Street, will be reconstructed in partnership with MnDOT. These projects will increase the walkability of the area, and also provide contracting opportunities to local small businesses for the construction. Each intersection will be redone individually as a small business contract. Construction is anticipated for Summer 2022.

125th Avenue (CSAH 14) Reconstruction - Harpers Street to Lexington Avenue (CSAH 17)

CSAH 14 will be upgraded from a two-lane rural section to a four-lane divided urban section from Harpers Street to CSAH 17.  The project will incorporate a multi-use bituminous trail within the corridor, along with a traffic control signal at the intersection of North Lake Boulevard and Legacy Creek Parkway.


Lexington Avenue (CSAH 17) Turn Lane Additions - Pheasant Ridge Drive to 112th Avenue

As part of Phase II of the 2022 Overlay Program, Anoka County is constructing dedicated right turn lanes on Lexington Avenue (CSAH 17) from Pheasant Ridge Drive to 112th Avenue, in the City of Blaine. 

West Freeway Drive Realignment (CSAH 23)

Anoka County received a Local Road Improvement Program grant to fund a portion of the realignment and reconstruction of West Freeway Drive, north of CSAH 23 (Lake Drive), which is a City roadway under the jurisdiction of City of Columbus.  In addition, the City of Columbus has received funding thru the State Park Road Account to fund road improvements for the access into onto the DNR’s Lamprey Pass Wildlife Management Area (LPWMA).  Recent County and MnDOT geometric improvements on Lake Drive and TH 97 have changed the existing West Freeway Drive access to a right-in/right-out only.

Bunker Lake Boulevard (CSAH 116) at Martin Street - Left Turn Lane & Median Improvements

As part of Phase II of the 2022 Overlay Program, Anoka County, in partnership with the City of Andover, is reconstructing the median and left turn lanes at the intersection of Bunker Lake Boulevard (CSAH 116), Martin Street and the Walmart access road.

 

2022 Overlay Program

Phase II (South) - starting July 1, 2022

Coon Rapids Blvd (CSAH 1) from 9th Avenue to Mississippi Blvd – Surface Reconditioning

East River Road (CSAH 1) from Mississippi Street (CSAH 6) to Osborne Road (CSAH 8) – Mill and Overlay

Lexington Avenue (CSAH 17) at Lake Drive (CSAH 23) and from North Road (CR 10) to 111th Avenue – Surface Reconditioning

Lake Drive (CSAH 23) from 2nd Avenue to Park Court – Mill and Overlay

Ash Street (CSAH 32) from Monarch Way to Centerville Road (CSAH 54) – Reclaim and Overlay

Lovell Road (CSAH 52) at 35W North Off ramp- Concrete Pavement

Bunker Lake Blvd (CSAH 116) at Thrush Street – Lane Reconfiguration

Bunker Lake Blvd (CSAH 116) 300’ West of T.H. 47 – Shoulder Widening



2022 MnDOT Projects in Anoka County

US Highway 10/169 Improvements - Anoka Solution - Greater MN Gateway

The US Highway 10/169 Improvement Project will include reconstruction of three intersections (Thurston Avenue, Fairoak Avenue, and Main Street), pedestrian walkway improvements and frontage road improvements. The improvements would reduce congestion, increase safety, and provide a more reliable route through the area.   Construction is scheduled for 2022-2023.