2023 Projects

Design Work Proposed for 2023 Construction


Coon Rapids Blvd (CSAH 1) at Mississippi Blvd - Signal Replacement

Anoka County, in partnership with the City of Coon Rapids, is developing a preliminary layout for replacing and updating the existing signal system at CSAH 1 (Coon Rapids Blvd) at Mississippi Boulevard, with anticipated construction in 2023.


Coon Rapids Blvd (CSAH 1) and Xavis Street - Signal Replacement

Anoka County, in partnership with the City of Coon Rapids, is developing plans to replace and update the existing signal system at CSAH 1 (Coon Rapids Blvd) at Xavis Street, with construction anticipated in 2023.



109th Avenue (CSAH 12) Pedestrian Ramp Improvement Project

Anoka County, in partnership with the State of Minnesota, is developing plans to reconstruct select pedestrian ramps along 109th Avenue NE (CSAH 12), in the City of Blaine.


Lexington Avenue (CSAH 17) and 131st Avenue N.E. - Signal Construction

Anoka County, in partnership with the City of Blaine, is developing plans to install a new signal system at Lexington Avenue (CSAH 17) at 131st Avenue, with construction anticipated in 2023.
 

Coon Creek Boulevard (CSAH 18) Bridge Replacement

Anoka County, in partnership with the City of Coon Rapids and the Coon Creek Watershed District, is developing construction plans for the replacement of the structurally deficient CSAH 18 bridge over Coon Creek in Coon Rapids. The project will widen the bridge footprint to accommodate the future four traffic lanes north of bridge, along with pedestrian facilities on both sides of the bridge.



Ambassador Boulevard NW (CSAH 28) at Seelye Brook - Bridge Repair

Anoka County is developing construction plans for a bridge replacement on Ambassador Boulevard NW (CSAH 28) at Seelye Brook.  



Old Central Avenue NE (CSAH 35) and Gardena Avenue

Anoka County, in partnership with the City of Fridley, is developing a preliminary layout for the construction of a roundabout at the intersection of Old Central Avenue NE (CSAH 35) at Gardena Ave N.E.



Hodgson Road (CSAH 49) and County Road J/Ash Street (CSAH 32)

Anoka County, in partnership with Ramsey County and the Cities of Lino Lakes and Shoreview, has hired WSB to develop design plans for intersection improvements of Hodgson Road from Emil Street to Rohavic Lane, and County Road J / Ash Street from Grotto Street to Ware Road. 



Radisson Road (CSAH 52) at Cloud Drive Intersection Improvement Project

Anoka County, in partnership with the City of Blaine, is developing a preliminary layout for improvements at the intersection of Radisson Road (CSAH 52) at Cloud Drive. 


Ramsey Gateway Project (CSAH 56 / CSAH 57)

Anoka County, MnDOT, and the City of Ramsey developed a locally supported vision of the Highway 10 corridor through Ramsey as part of the Ramsey Gateway Highway 10 Study. The Ramsey Gateway Highway 10 Project continues that vision with design of two grade-separated interchanges at Ramsey Boulevard and Sunfish Lake Boulevard that will replace existing signalized intersections. Grade separation of the BNSF Railway and a new frontage road between Ramsey Boulevard and Sunfish Lake Boulevard are also part of this design project.



Armstrong Boulevard (CSAH 83) and Alpine Drive - Roundabout Construction

Anoka County, in partnership with City of Ramsey, is developing a preliminary layout for the County Highway Corridor, CSAH 83 (Armstrong Blvd NW) at the intersection with Alpine Drive.