Viking Boulevard (CSAH 22) from TH47 to Rum River Boulevard (CSAH 7)

Project Summary

Project Background/Description
Anoka County, in partnership with the City of Nowthen and City of Oak Grove, is developing design plans for the reconstruction of Viking Boulevard (CSAH 22) from TH 47 to Rum River Boulevard (CSAH 7). 

Viking Boulevard is a critical Minor Arterial that runs east-west, the only one that spans the entire county. It provides connectivity between several major highways, including I-35, TH 65 and TH 47. The average ADT is 8,300 and is expected to increase, due to the potential for economic development and planned growth in the area.

The project is currently in the Design Phase.  Construction is currently anticipated to be in 2024. 
 

Project Goals
Provided below are the project goals being considered during the design and construction phase of this project:

  • Safely accommodate all users, including motor vehicles, freight, pedestrians, and bicyclists
  • Improve storm water management and treatment where feasible
  • Develop a financially responsible design that minimizes right-of-way and environmental resource impacts
     
     

Schedule
Below is an overview of the project schedule, identifying key milestones in the process: 

  • Develop Geometric Layout – Spring/Summer 2022
  • Preliminary Design – Fall 2022/Winter 2023
  • Public Open House – February 2023
  • Final Design – Summer 2023
  • Construction – Spring/Summer 2024

 

Layout
Current Layout - 06/26/2023

 

Project Contacts

If you have any questions about the proposed project or would like to comment on any aspect of the project, please contact either of the representatives below:

  • Michelle Pritchard, Design Engineer II
    763-324-3162 or Email

  • Nicholas Dobda, Manager, Engineering
    763-324-3118 or Email