What are the study limits?
The primary study area for the study includes all of CSAH 34, extending west from CSAH 49 (Hodgson Road) to CSAH 54 (20th Street) on the east. A secondary study area includes investigating a possible extension of CSAH 34 over I-35E to connect to County Road 84 (Otter Lake Road), a north and south collector. View the corridor map.

Show All Answers

1. What is a corridor study, and what kinds of things does it look at?
2. What are the study limits?
3. Why is a study needed?
4. What is the project timeline?
5. What is a Technical Advisory Committee (TAC)?
6. How can interested neighborhood representatives and the general public get involved with the study process?
7. Who is SRF Consulting Group, Inc.?